1
/
of
6
Souvela
Gueevin 2 Sheets Paris Tower Stickers Eiffel Tower Sticker Decal for Bedroom Living Room Sofa Backdrop TV Wall Romance Decoration
Gueevin 2 Sheets Paris Tower Stickers Eiffel Tower Sticker Decal for Bedroom Living Room Sofa Backdrop TV Wall Romance Decoration
Regular price
$35.95 USD
Regular price
$45.99 USD
Sale price
$35.95 USD
Unit price
/
per
Tax included.
Shipping calculated at checkout.
Couldn't load pickup availability
About this item
- Package includes: you will receive 2 sheets of Eiffel tower wall stickers measuring 11.2 x 35.4 inch, each sheet including 1 piece of Eiffel tower sticker, the letters of Paris and some butterflies and hearts, which provide sufficient quantity for you to decorate different rooms
- Romantic design: the removable Paris tower wall decals can exactly add the relaxing and warm atmosphere with the romantic elements to your home without painting or damaging your walls, which can be removed easily and would not leave adhesive residue
- Reliable material: the stick and peel romance wall decals are made of vinyl material for serving you for a long time, which are easy to stick on the surfaces by peeling off the adhesive film and pasting on any smooth surface you like
- Various applications: the Eiffel tower wall decors can be applied to wall decorations and photo props, suitable for smooth, flat, dry and clean surfaces like windows, doors, painted walls, tiles, etc.; You can use them to decorate the living rooms, bedrooms, kitchens, TV walls and sofa background
- Note: the tower letters vinyl wall stickers may have some smell after production, please open them in a ventilated place to air for a few hours, and the smell will dissipate; After that, you could apply the wall decals in your house confidently
Share
